CSIRO.au logo and link to website
 

CSIRO Land and Water information is being migrated to the CSIRO.au website.

View the new website: www.csiro.au/clw

Legacy Links

The Murray-Darling Basin Sustainable Yields Project

At the Murray-Darling Basin Water summit, convened by the Prime Minister on 7 November 2006, it was agreed to:
Commission the CSIRO to report progressively by the end of 2007 on sustainable yields of surface and groundwater systems within the Murray-Darling Basin, including an examination of assumptions about sustainable yields in light of changes in climate and other issues.

As a result, the CSIRO has been contracted by the National Water Commission to report on current and future water availability in the Murray-Darling Basin.

Project Methods & Terms of Reference | Regions | Technical Reports | Final Report
A subset of the data used in the Murray-Darling Basin Sustainable Yields project can be accessed via the CSIRO Data Access Portal

Whole of Basin Final Report

Water Availability in the Murray-Darling Basin
This report from the CSIRO Murray-Darling Basin Sustainable Yields Project summarises the assessments for 18 regions that comprise the Basin.

Project Methods and Terms of Reference

Regions

The individual regions assessed as part of the CSIRO Murray-Darling Basin Sustainable Yields Project are:

Technical Reports Basin-wide Data

Further information on the Sustainable Yields Projects.